Nuscale Power Doubled over 4 Years and Up 10X From 2024 Lows
NuScale and Standard Power are developing two new nuclear reactors facilities in Ohio and Pennsylvania powered by its SMR technology. The plan is to build 24 units of its 77 MWe modules, producing 1,848 MWe energy from both sites. Standard Power thinks this facility could be operational by 2029 at the earliest. Nuscale has developed ...
Keep reading with a 7-day free trial
Subscribe to next BIG future to keep reading this post and get 7 days of free access to the full post archives.